Implementation of newsfeed or timeline feature is a frequent requirement for social applications. The following exmaples are inspired by Newsfeed feature powered by Neo4j Graph Database. The query asked here is:
Starting at me, retrieve the time-ordered status feed of the status updates of me and and all friends that are connected via a CONFIRMED FRIEND relationship to me.
Query.
START me=node:node_auto_index(name='Joe') MATCH me-[rels:FRIEND*0..1]-myfriend WHERE ALL(r in rels WHERE r.status = 'CONFIRMED') WITH myfriend MATCH myfriend-[:STATUS]-latestupdate-[:NEXT*0..1]-statusupdates RETURN myfriend.name as name, statusupdates.date as date, statusupdates.text as text ORDER BY statusupdates.date DESC LIMIT 3
To understand the strategy, let’s divide the query into five steps:
FRIEND relationship (MATCH me-[rels:FRIEND*0..1]-myfriend). Also, the WHERE predicate can be added to check whether the friend request is pending or confirmed.
MATCH myfriend-[:STATUS]-latestupdate).
NEXT relationships (MATCH myfriend-[:STATUS]-latestupdate-[:NEXT*0..1]-statusupdates).
ORDER BY statusupdates.date DESC).
LIMIT the number of updates you need in every query (LIMIT x SKIP x*y).
Here, the example shows how to add a new status update into the existing data for a user.
Query.
START me=node:node_auto_index(name='Bob')
MATCH me-[r?:STATUS]-secondlatestupdate
DELETE r
WITH me, secondlatestupdate
CREATE me-[:STATUS]->(latest_update{text:'Status',date:123})
WITH latest_update,secondlatestupdate
CREATE latest_update-[:NEXT]-secondlatestupdate
WHERE secondlatestupdate <> null
RETURN latest_update.text as new_status
Dividing the query into steps, this query resembles adding new item in middle of a doubly linked list:
STATUS relationship (MATCH me-[r?:STATUS]-secondlatestupdate).
STATUS relationship between user and secondlatestupdate (if it exists), as this would become the second latest update now and only the latest update would be added through a STATUS relationship, all earlier updates would be connected to their subsequent updates through a NEXT relationship. (DELETE r).
statusupdate node (with text and date as properties) and connect this with the user through a STATUS relationship (CREATE me-[:STATUS]->(latest_update{text:'Status',date:123})).
NEXT relationship between the latest status update and the second latest status update (if it exists) (CREATE latest_update-[:NEXT]-secondlatestupdate WHERE secondlatestupdate <> null).
Result
| new_status |
|---|
| 1 row |
| Nodes created: 1 |
| Relationships created: 2 |
| Properties set: 2 |
| Relationships deleted: 1 |
| 2 ms |
|
Copyright © 2013 Neo Technology