Interface PatchJobs.PatchRolloutOrBuilder

All Superinterfaces:
com.google.protobuf.MessageLiteOrBuilder, com.google.protobuf.MessageOrBuilder
All Known Implementing Classes:
PatchJobs.PatchRollout, PatchJobs.PatchRollout.Builder
Enclosing class:
PatchJobs

public static interface PatchJobs.PatchRolloutOrBuilder extends com.google.protobuf.MessageOrBuilder
  • Method Summary

    Modifier and Type
    Method
    Description
    The maximum number (or percentage) of VMs per zone to disrupt at any given moment.
    The maximum number (or percentage) of VMs per zone to disrupt at any given moment.
    Mode of the patch rollout.
    int
    Mode of the patch rollout.
    boolean
    The maximum number (or percentage) of VMs per zone to disrupt at any given moment.

    Methods inherited from interface com.google.protobuf.MessageLiteOrBuilder

    isInitialized

    Methods inherited from interface com.google.protobuf.MessageOrBuilder

    findInitializationErrors, getAllFields, getDefaultInstanceForType, getDescriptorForType, getField, getInitializationErrorString, getOneofFieldDescriptor, getRepeatedField, getRepeatedFieldCount, getUnknownFields, hasField, hasOneof
  • Method Details

    • getModeValue

      int getModeValue()
       Mode of the patch rollout.
       
      .google.cloud.osconfig.v1beta.PatchRollout.Mode mode = 1;
      Returns:
      The enum numeric value on the wire for mode.
    • getMode

       Mode of the patch rollout.
       
      .google.cloud.osconfig.v1beta.PatchRollout.Mode mode = 1;
      Returns:
      The mode.
    • hasDisruptionBudget

      boolean hasDisruptionBudget()
       The maximum number (or percentage) of VMs per zone to disrupt at any given
       moment. The number of VMs calculated from multiplying the percentage by the
       total number of VMs in a zone is rounded up.
      
       During patching, a VM is considered disrupted from the time the agent is
       notified to begin until patching has completed. This disruption time
       includes the time to complete reboot and any post-patch steps.
      
       A VM contributes to the disruption budget if its patching operation fails
       either when applying the patches, running pre or post patch steps, or if it
       fails to respond with a success notification before timing out. VMs that
       are not running or do not have an active agent do not count toward this
       disruption budget.
      
       For zone-by-zone rollouts, if the disruption budget in a zone is exceeded,
       the patch job stops, because continuing to the next zone requires
       completion of the patch process in the previous zone.
      
       For example, if the disruption budget has a fixed value of `10`, and 8 VMs
       fail to patch in the current zone, the patch job continues to patch 2 VMs
       at a time until the zone is completed. When that zone is completed
       successfully, patching begins with 10 VMs at a time in the next zone. If 10
       VMs in the next zone fail to patch, the patch job stops.
       
      .google.cloud.osconfig.v1beta.FixedOrPercent disruption_budget = 2;
      Returns:
      Whether the disruptionBudget field is set.
    • getDisruptionBudget

      Common.FixedOrPercent getDisruptionBudget()
       The maximum number (or percentage) of VMs per zone to disrupt at any given
       moment. The number of VMs calculated from multiplying the percentage by the
       total number of VMs in a zone is rounded up.
      
       During patching, a VM is considered disrupted from the time the agent is
       notified to begin until patching has completed. This disruption time
       includes the time to complete reboot and any post-patch steps.
      
       A VM contributes to the disruption budget if its patching operation fails
       either when applying the patches, running pre or post patch steps, or if it
       fails to respond with a success notification before timing out. VMs that
       are not running or do not have an active agent do not count toward this
       disruption budget.
      
       For zone-by-zone rollouts, if the disruption budget in a zone is exceeded,
       the patch job stops, because continuing to the next zone requires
       completion of the patch process in the previous zone.
      
       For example, if the disruption budget has a fixed value of `10`, and 8 VMs
       fail to patch in the current zone, the patch job continues to patch 2 VMs
       at a time until the zone is completed. When that zone is completed
       successfully, patching begins with 10 VMs at a time in the next zone. If 10
       VMs in the next zone fail to patch, the patch job stops.
       
      .google.cloud.osconfig.v1beta.FixedOrPercent disruption_budget = 2;
      Returns:
      The disruptionBudget.
    • getDisruptionBudgetOrBuilder

      Common.FixedOrPercentOrBuilder getDisruptionBudgetOrBuilder()
       The maximum number (or percentage) of VMs per zone to disrupt at any given
       moment. The number of VMs calculated from multiplying the percentage by the
       total number of VMs in a zone is rounded up.
      
       During patching, a VM is considered disrupted from the time the agent is
       notified to begin until patching has completed. This disruption time
       includes the time to complete reboot and any post-patch steps.
      
       A VM contributes to the disruption budget if its patching operation fails
       either when applying the patches, running pre or post patch steps, or if it
       fails to respond with a success notification before timing out. VMs that
       are not running or do not have an active agent do not count toward this
       disruption budget.
      
       For zone-by-zone rollouts, if the disruption budget in a zone is exceeded,
       the patch job stops, because continuing to the next zone requires
       completion of the patch process in the previous zone.
      
       For example, if the disruption budget has a fixed value of `10`, and 8 VMs
       fail to patch in the current zone, the patch job continues to patch 2 VMs
       at a time until the zone is completed. When that zone is completed
       successfully, patching begins with 10 VMs at a time in the next zone. If 10
       VMs in the next zone fail to patch, the patch job stops.
       
      .google.cloud.osconfig.v1beta.FixedOrPercent disruption_budget = 2;